Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Called point of contact. Received no response. Got to the site and the lock box code that was given was incorrect. Reschedule at your convenience. 10/7/2026 | |
| 10/08/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Framing has not been completed or approved. Sheathing requires blocking at edges to have the 6/12 nailing pattern. Decking missing nails through. Ensure nails do not over penetrate more than an 1/8". Beams are upside down and are not sitting completely on hardware. Rafters are not siting completely on beams. Double top plate has been over notched due to line set. Provide cs16 strap at corner to tie in walls. Stopped inspection. Other items will apply. 10/8/2026 | |
| 10/13/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | 10/13/26: add nails to h-3 at back patio beam, missing sd screws at each stud/ledger see detail 203, plans call HUS-212 hangers, missing C.C.Q.M at masonry piers, missing A-35's per detail 204, add nails to sheathing at marked locations and provide a ladder for roof access-ladder shall extend 3' above roof line. Stopped inspection-additional items may be noted. | |
| 10/16/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/16/2026 All corrections made. |