Inspection History Details
Inspection Status: Not Applicable
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | BULD - Electrical Clearance | Not Applicable | 06/10/2026 Approved per plan, verified solar panel reinstall after roof repair. No new work or alteration to existing PV system. DG meter set and locked. |