Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | RSBU - Building FinalĀ | Passed | 06/10/2026 Approved per plan, verified solar panel reinstall after roof repair. No new work or alteration to existing PV system. DG meter set and locked. |