Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | COT - RSEL - Electrical FinalĀ | Passed | 6.25.25 Panel schedule verified. Panel is properly secured, rise is secured in two places, roof jack sealed, bracing kit present on mast, white tape present on neutrals, all openings are in use or covered appropriately, proper grounding/bonding verified. |