Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Partial pass. Provide FHA plates at both kitchen and dryer ducts. Provide fire foam at top plates that been missed. Certain areas where HVAC ducts are choked. Correct blocking that has been installed around flue vent in mechanical room. Provide clean out at hallway bathroom. Remove pex from metal brace. Ensure wiring is per the panel schedule. Thermostat should be at 48" from finished floor. 9/15/2025 | |
| 09/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9.16.2025 Corrections made from prior 9.15.2025 inspection. Panel wire schedule was reviewed by electrician and letter will be submitted to TDC online portal. |