Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2025 | BULD - Electrical Clearance | Passed | 11.10.2025 Clearance TEP DGC/DGL/BAT for MSA and Tesla Powerwall. Note: DGC solar meter already set and existing, scope of work only added battery with disconnect and meter adapter. |