Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 10:00am Pending solar |
|
| 07/28/2025 | BULD - Electrical Clearance | Passed | Passed solar final 7/28/25 CLEARANCE DGC/BAT |