Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-0425-02187
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Canceled
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Canceled. | |
| 08/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Drywall in place of all new addition prior to inspection of in walls. Remove insulation to verify wiring and plumbing. Fire foam all top plate penetrations. Add nail plates to those that are within an 1 1/4" from face of stud. DWV not in test. Smoke detectors not in place. Remove drywall screw at fan box. Plans call for a 3 way switch at master bedroom. Add blocking to three sides at registers. 30" clearance is required at sub panel at final. Sub panel make up prior to inspection. Knock out missing at top of panel. Stopped inspection. Other items may apply. 8/13/2025 | |
| 08/14/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/14/2025 approved. |