Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | RSBU - Building FinalĀ | Passed | 6.30.25 PV system installed per plans. Proper conductors verified. Panels braced. Grounding and bonding verified. Labels verified equipment faces and conduits. |