Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2025 | RSBU - Building Final | Re-inspection required | 12/16/2025: A Stop Work Order was posted due to work being performed outside the approved scope of work. Revised drawings are required to include all in-wall plumbing and electrical, as well as any new mechanical work. A GAS schematic must also be provided for the work performed. Images have been attached on files. | |
| 12/29/2025 | RSBU - Building Final | Re-inspection required | 12-29-25: left voicemail at 948am, arrived on site at 953am-no access to site. I waited until 1010am and left. | |
| RSBU - Building Final | Re-inspection required | 12-31-25: submit an electrical revision showing new work. Schedule the building final once revision is approved. Note: GFCI's are required at kitchen, bathroom, laundry room, and arch fault breakers at panel are required for all habitable areas. |