Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 1:40pm Pending Solar |
|
| 07/03/2025 | BULD - Electrical Clearance | Passed | 7.3.25 PV system is installed according to plans. Proper conductors use throughout. Equipment is secured and labeled throughout. Address label verified. Meter number recorded. Labels verified at conduit. Proper grounding and bonding verified as well as neutrals. Panel schedule is labeled and all unused spaces properly covered. DGC CLEARANCE TO TEP. |