Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | RSBU - Building FinalĀ | Passed | 7.3.25 PV system is installed according to plans. Proper conductors use throughout. Equipment is secured and labeled throughout. Address label verified. Meter number recorded. Labels verified at conduit. Proper grounding and bonding verified as well as neutrals. Panel schedule is labeled and all unused spaces properly covered. DGC CLEARANCE TO TEP. |