Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2025 | BULD - Electrical Clearance | Partial Pass | TEP CLEARANCE: INCR, called TEP @11:00. Partial pass, Pending solar. | |
| 12/30/2025 | BULD - Electrical Clearance | Passed | 12.30.25 PV system is verified with non fused disconnect, proper conductors, panel count, grounding, bracing and labeling |