Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | BULD - Electrical Clearance | Partial Pass | 6/13/25 TEP CLEARANCE: DGL, Called TEP @ 9:51. Partial pass pending SOLAR. |
|
| 06/25/2025 | BULD - Electrical Clearance | Passed | Approved solar with 150A derate and powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |