Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 10:15 am Pending solar final |
|
| 08/14/2025 | BULD - Electrical Clearance | Passed | 8.14.25 DGC/BAT PV system verified as per plans Approved |