Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2025 | BULD - Electrical Clearance | Passed | 6.27.25 PV system is installed as per plan. Proper conductors used throughout. Labeling verified at panels and conduits. Proper groundings, bondings. Neutrals marked with white. Address label present. |
|
| 08/07/2025 | BULD - Electrical Clearance | Passed | 8/7/25 TEP CLEARANCE:DGC |