Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | RSBU - Building FinalĀ | Passed | 6.6.25 Correct connections, bondings, bracing, groundings, wire sizes, labeling all verified. DGC/INCR |