Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Preslab  

Date Description Inspector Results Comments
06/24/2025 COT - RSBU - Preslab   Re-inspection required 6/24/25: reinforcement must maintain 3" clearance from earth, footing depth not per approved plans 12" min, reinforcement at existing concrete slabs was never verified prior to concrete placement (please verify reinforcement via documentation or third party report), revision required for proper documentation and details on dowels required from existing slab to new portion of slab at AZ room. Re-inspection required.
07/10/2025 COT - RSBU - Preslab   Passed 7/10/25
All corrections have been made.