Inspection Status: Requested
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Requested |
|
| 08/15/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
8-15-25: electrical not per approved plans. Submit an updated electrical plan/schedule to the city for review and approval. All metal boxes must be grounded at time of inspection, bank plates are required where electrical wires are closer than 1 1/4" from edge of studs. |
| 10/03/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
10-3-25: all receptacles & projected can lights at interior & exterior must be made up at time of inspection. Remove pancake lid at exterior porch to verify grounding. Per code, wiring for lights/ceiling fan at porch must be installed in nm cable. |
| 11/03/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
11-3-25: corrections made- okay to insulate and install drywall. Schedule a drywall nailing inspection prior to tape & texture. |