Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 11/18/24 partial pass. needs fire blocking at wire through headers, condensation line from split as drills through 6x6 studs at NW corner of the addition, studs need to be replaced or needs stud shoe. | |
| 11/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 11/19/24 Multiple branch circuits tied together, box fill at exterior lighting is exceeding capacity. Metallic boxes must be grounded, fire block all penetrations at top plates, secure wiring to studs minimum 6" from receptacle | |
| 11/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 11/22/24 not ready, refer to electrical plans per schedule | |
| 11/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11/18/24 partial pass. needs fire blocking at wire through headers, condensation line from split as drills through 6x6 studs at NW corner of the addition, studs need to be replaced or needs stud shoe. 11/19/24 Multiple branch circuits tied together, box fill at exterior lighting is exceeding capacity. Metallic boxes must be grounded, fire block all penetrations at top plates, secure wiring to studs minimum 6" from receptacle 11/22/24 not ready, refer to electrical plans per schedule 11/25/24: not ready |
|
| 11/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |