Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | COT - RSBU - Masonry Pregrout | Passed | 2 front columns CMU block is laid to 4' high with the required rebar reinforcement in each cell. Okay to grout the first lift on each column. |