Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 06/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6/16/25: All metallic boxes must be grounded, seal all penetrations through top plate and through vapor barrier. Pex support required throughout (vertical/ horizontal/ termination), Bocca plates required throughout at plumbing lines, nail plates required at rough-in electrical/plumbing that comes within 1 1/4" of the face of the 2x, plastic grommets required at exhaust fans, exhaust fan flex missing at time of inspection, receptacles missing at porch, s-trap at laundry standpipe, mini split condensate lines must be installed at time of inspection, all light fixtures must be roughed-in, peninsula receptacle and frame must be roughed-in, STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
| 06/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/30/25 Pass |