Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-New 8x2x5/16 is missing at West end. 2-New 8x2x5/16 at midspan is not installed per detail 7. 3- Detail 1 specifies 5x5, plan specifies 4x4 columns; please revise to clarify. 4-Beam to beam connections are not per detail 3. |
|
| 10/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/7/2026 Corrections made to prior inspection on 9/9/26. Two permit conditions are unsatisfied, use remaining open inspection to call in when satisfied. |