Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | RSBU - Building Final | Not Ready | 6/2/25 meter socket adapter not installed | |
| 07/02/2025 | RSBU - Building Final | Passed | Approved solar - DGC Clearance is required for the solar meter (5th rev) |