Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 07/19/2023 |
BULD - Electrical Clearance |
|
Not Ready |
|
| 10/11/2023 |
BULD - Electrical Clearance |
|
Canceled |
Cancelled per contractor. |
| 10/12/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
Plans call for 60amp disconnect. Has a 30amp installed. |
| 12/01/2023 |
BULD - Electrical Clearance |
|
Not Ready |
NR, installation not per the revised plans on site |
| 12/19/2023 |
BULD - Electrical Clearance |
|
Passed |
DGC |