Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-0423-04075
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4/23/24: seal all penetrations going through vapor barrier (around receptacle boxes and lighting boxes), fire blocking required at soffit at kitchen, BOCA plates at DWV at kitchen, open chase at hallway closet, wiring for receptacles must be supported 8" from box, fire blocking at soffit at hallway required, seal of top plate at partition wall between bedroom and bathroom, seal penetrations through top plate at south bedroom, seal all joints st ductwork, receptacles missing at kitchen opposite side of range per code, 18" of copper before transitioning to pex, domestic water not under pressure, DWV not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
05/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | please add block behind shower diverter take a photo, all other items corrected, ok to proceed | |
05/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |