Inspection History Details
Inspection Status: Passed
Inspection History: RSPL - Plumbing Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2023 | RSPL - Plumbing Progress | Passed | 4/7/23- Electric Water Heater needs lock out breaker at main panel or Disconnect in line of sight of water heater. 4/12/23- lock out breaker installed by Delta Mechanical |