Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | COT - RSPL - Rough Soil | Passed | 04/03/2026 Approved per plan, verified 1" PEX line from meter to riser with blue tracer wire and sleeved under slab, psi at 65 with PRV, holding under test. Okay to backfill with shading material. |