Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2026 | COT - RSME - Mechanical Final | Re-inspection required | 3/26/26 1. Missing T/P pipe 2. Vent needs to be secured 3. Water heater is not designed to be outside; recommend providing proper shelter to protect for elements. Current shelter is loose and missing the front door. |
|
| 04/01/2026 | COT - RSME - Mechanical Final | Not Ready | ||
| 04/06/2026 | COT - RSME - Mechanical Final | Re-inspection required (with fee) | 4-6-26: secure vent with a clamp, hot copper side of water heater requires a minimum of R3 insulation, a 1 -1/2" air gap is required for T/P pipe, paint T/P pipe to protect against the elements. | |
| 04/23/2026 | COT - RSME - Mechanical Final | Re-inspection required | 4/23/26 Air gap required for T/P pipe, gas line required sediment trap | |
| 07/15/2026 | COT - RSME - Mechanical Final | Passed | 07/15/2026 Corrections made to prior inspection, verified created air gap at bottom of pressure relief pipe and painted. |