Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | ||
| 09/16/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 9/16/2026 not ready. Drywall in place prior to intermediate approval. Missing smoke detectors in bedrooms. Receptacle spacing in bedrooms not per code. Missing nail plates throughout. Stopped inspection. Other items may apply. | |
| 09/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-Previous corrections have not been completed per Code. 2-Work has been completed without inspections, and/or beyond what is shown on approved plans; including but not limited to windows being replaced needing tempered glazing. Builder on site instructed to obtain revision for all items not on approved plans before covering any further work, and remove floor sheathing to allow inspection of under floor framing. |
|
| 09/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |