Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | COT - RSPL - Rough Soil | Passed | 4-2-26: gas line verified per plans, system verified under test at 15psi. Okay to backfill using shading materials.SWG clearance issued on meter 22182570. |