Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof NailingĀ 

Date Description Inspector Results Comments
05/27/2026 COT - RSBU - Roof NailingĀ  Re-inspection required 5-27-26: plans call for Simpson CC66 Column caps and Simpson PB/AB type column base. Add nails to roof sheathing at 6" o.c. Along edges, missing 1- 6x6 post column.
05/28/2026 COT - RSBU - Roof NailingĀ  Partial Pass 5-28-26: RFI on post verified-okay to dry-in roof. Please submit a letter to the city documenting that the Simpson Strong Tie base cap-ABU66Z & the Simpson Strong Tie-ECCQ6 end cap are equivalent to what the plans originally called for. The letter must be submitted by a licensed contractor and city approval is required. Okay to continue with construction but at own risk.