Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 05/27/2026 |
COT - RSBU - Roof NailingĀ |
|
Re-inspection required |
5-27-26: plans call for Simpson CC66 Column caps and Simpson PB/AB type column base. Add nails to roof sheathing at 6" o.c. Along edges, missing 1- 6x6 post column. |
| 05/28/2026 |
COT - RSBU - Roof NailingĀ |
|
Partial Pass |
5-28-26: RFI on post verified-okay to dry-in roof. Please submit a letter to the city documenting that the Simpson Strong Tie base cap-ABU66Z & the Simpson Strong Tie-ECCQ6 end cap are equivalent to what the plans originally called for. The letter must be submitted by a licensed contractor and city approval is required. Okay to continue with construction but at own risk. |