Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | COT - RSEL - Electrical FinalĀ | Passed | 04/02/2026 Approved clearance TEP INCR for 200A MPU, ready for cutover. Verified branch circuits landed and labeled, trench 2.5" schl 40 conduit run of 60' from old panel to new ADU. |