Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 6.9.26 1. Receptacle spacing not up to code need 2 more receptacles to meet code. One 6ft on the left side of door and another 6ft on the right side of door, and then the spacing becomes every 12ft. 2. Nail guards needed on studs with boring within 1.25" of stud edge. 3. Seal all top plate penetrations with fire caulk or fire putty. |