Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2026 | COT - RSBU - Excavation/Rebar/Zoning | Not Ready | At new addition, provide proper tape to seal tares at vapor barrier. Remove loose fill and debris from footings. Ensure a 3” clearance is provide from earth. Interior footings in dwelling cannot bear weight on plumbing lines nor be within a 45* (degree) from bearing points. (Plumbing line cannot run parallel with footer.) Footer at kitchen area approved only 11/13/2026 |
|
| 11/17/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 11-17-26 All corrections were made at New Edition OK for concrete placement pending previous notes Interior footings in dwelling cannot bear weight on plumbing lines nor be within a 45* (degree) from bearing points. (Plumbing line cannot run parallel with footer.) |