Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2026 | RSBU - Building Final | Re-inspection required | 4/16/26 1. Label C.B at main panel. 2. Secure gas line properly, zip ties will rot and break. 3. Secure drain line. |
|
| 04/21/2026 | RSBU - Building Final | Passed | 4/22/26 corrections made |