Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | BULD - Electrical Clearance | Passed | ||
| 06/24/2025 | BULD - Electrical Clearance | Passed | 6.24.25 INCR TEP VERBAL CLEARANCE. Riser has been adjusted to create the required 10ft clearance height and brace kit has been installed. Lugs torqued and proper wires installed. |