Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 06/18/2026 Partial pass pending remaining eletrical, mechanical intermediate rough-in. Verified casita shower, holding under test, ok to cover up for plastering. Added fire caulking to top plate penetration and Boca nail plate at sill plate to protect drain pipe. |
|
| 06/24/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 06/24/2026 Partial pass. Verified NM cable roughed-in to interior ICF block walls. |
|
| 06/29/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6.29.26 Pass, no HVAC or exhaust listed on plans. |
|
| 09/15/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 09/15/2026 Verified living room final, approved per plan. |