Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | RSBU - Building FinalĀ | Passed | 7.1.25 DGC/DGL/BAT CLEARANCE CODE PV system installed as per plans. Proper conductors verified. Proper placards/labeling observed at all panels and conduits. Bonding/grounding/neutrals verified. |