Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Gas Pressure Test
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/22/2025 | COT - RSPL - Gas Pressure Test | Re-inspection required | -Furnace b-vent has negative slope. 2-Exterior piping is less than 3-1/2” above grade. 3-Test gauge needs to show 1/10 pound increments. 4-Sediment tr is incorrect. |
|
| 08/26/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 8/26/25 | |
| 09/03/2025 | COT - RSPL - Gas Pressure Test | Passed |