Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - BULD - SWG Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - BULD - SWG Clearance | Re-inspection required | 1-Furnace b-vent has negative slope. 2-Exterior piping is less than 3-1/2” above grade. 3-Test gauge needs to show 1/10 pound increments. 4-Sediment tr is incorrect. |
||
| 08/22/2025 | COT - BULD - SWG Clearance | Re-inspection required | -Furnace b-vent has negative slope. 2-Exterior piping is less than 3-1/2” above grade. 3-Test gauge needs to show 1/10 pound increments. 4-Sediment tr is incorrect. |
|
| 08/26/2025 | COT - BULD - SWG Clearance | Passed | Passed 8/26/25 | |
| 09/03/2025 | COT - BULD - SWG Clearance | Re-inspection required | Provide combustion air for gas furnace. | |
| 09/04/2025 | COT - BULD - SWG Clearance | Passed | New gas service. |