Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:50pm Pending solar final |
|
| 08/21/2025 | BULD - Electrical Clearance | Not Applicable | ||
| 08/21/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla switch - DGL Clearance was called into TEP at 10:20am Pending solar final - NR |
|
| 08/21/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla switch - DGL Clearance was called into TEP at 10:20am Pending solar final - NR |
|
| 09/09/2025 | BULD - Electrical Clearance | Passed | ||
| 09/09/2025 | BULD - Electrical Clearance | Passed | 9.9.2025 Clearance for TEP DGC/BAT. |