Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 and switch - DGC/DGL/BAT Clearance to TEP is required |