Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 07/22/2026 Canceled at contractor request. |
|
| 07/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 07/27/2026 Not ready. Call in at intermediate mechanical, electrical, plumbing rough-in. |
|
| 09/03/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-Dry in building. 2-Water heater requires 18" minimum of copper past drywall penetrations. 3- Mount service and land ufer. 4-Home-runs must be in service panel. 5- Provide test for gas piping.. 6-Studs in exterior wall of bathroom have been over-notched. 7- Fire blocking has not been sealed. Inspection stopped; walk for Code compliance before re-scheduling inspection to avoid re-inspection fees being assessed. |
|
| 09/28/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed |