Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Inspection Status: Canceled

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
07/22/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 07/22/2026
Canceled at contractor request.
07/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 07/27/2026
Not ready. Call in at intermediate mechanical, electrical, plumbing rough-in.
09/03/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1-Dry in building.
2-Water heater requires 18" minimum of copper past drywall penetrations.
3- Mount service and land ufer.
4-Home-runs must be in service panel.
5- Provide test for gas piping..
6-Studs in exterior wall of bathroom have been over-notched.
7- Fire blocking has not been sealed.
Inspection stopped; walk for Code compliance before re-scheduling inspection to avoid re-inspection fees being assessed.
09/28/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed