Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP Pending solar |
|
| 05/28/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass to backfill trench, unable to add separate electrical underground inspection | |
| 06/02/2025 | BULD - Electrical Clearance | Passed | ||
| 06/02/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required |