Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6-4-26: secure DWV using clamp or strap within 4' aff, fire foam all penetrations at marked locations, missing thermostat-install at 48" aff, missing receptacles-add at marked locations, missing smoke detector at living room, missing exterior light, a shower liner test is required-see IRC P2503.6 or IPC 312.9 for details, access to subpanel is required, seal penetration where electrical wires penetration interior wall at shower. Stopped inspection-additional items may be noted. | |
| 06/12/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 06/12/202 Corrections made to prior inspection, verified access to subpanel and added clamps to PEX water line at shower. |