Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | BULD - Electrical Clearance | Partial Pass | 6/10/25 TEP CLEARANCE: DGL for Tesla Switch, verbal given to TEP and called in at 9:53. Partial pass. |
|
| 06/25/2025 | BULD - Electrical Clearance | Passed | 6.25.25 Solar system installed per plans. Boxes/panels are properly secured, all conduits secured. |