Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required (with fee)
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/23/2026 |
RSBU - Building Final |
|
Re-inspection required (with fee) |
Per previous notes. 1/23/2026 |
| 03/09/2026 |
RSBU - Building Final |
|
Re-inspection required |
3/9/26: multiple receptacles have open ground, grounds and neutrals tied together at sub panel at patio, sub panel will need to be replaced as circuits are being tied in together at breakers, smoke detector required at bedroom, bathroom circuit tied into 40amp laundry circuit, multiple circuits tied in together. Properly label panel |
| 04/03/2026 |
RSBU - Building Final |
|
Passed |
|
| 08/26/2025 |
RSBU - Building Final |
|
Not Ready |
|