Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | BULD - Electrical Clearance | Re-inspection required | 7 March 2025 1 .Electrical panel is missing dead front, there's also exposed wires in the electrical panel. 2. Electrical panel is in a storage area, with shelves in front of it. Panels need to easily accessible. 3. Please correct all above and resubmit for inspection. |
|
| 03/19/2025 | BULD - Electrical Clearance | Passed | 3-19-25, listed items from previous inspection have been corrected. However, customer is missing metallic address label and breakers need to be labeled. RECN clearance issued to TEP. Customer will schedule final inspection once these two requirements have been completed. |