Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter, DGL Clearance was called into TEP at 10:10am Pending solar |
|
| 06/13/2024 | BULD - Electrical Clearance | Passed | Approved with battery installation, DGC/BAT Clearance to TEP is required |